We recently carried out an electrical installation to a customers Kitchen-Diner Extension in Shawford, Winchester. The property is an older house undergoing a major renovation. An internal wall was removed, the house was extended and a basement was constructed.
Our electrical work covered the first completed stage of the renovation: the new open-plan kitchen and dining area. The basement electrical installation has not yet been carried out.
New electrical supply
We installed a new sub-main from the existing main consumer unit, situated approximately in the middle of the property, to a new consumer unit serving the kitchen-diner.
The sub-main consisted of 16mm² twin-and-earth cable with an additional separate 10mm² earth conductor.
To install the cable, we had to lift carpets and floorboards and route it through the existing house.
Installation challenges
The most difficult part was routing the new sub-main through the existing floor voids.
These spaces were already heavily occupied by plumbing pipework and existing electrical cables, leaving limited room for the new cable.
Despite the restricted access, we successfully completed the cable run.
New consumer unit
We installed a Navitas consumer unit in the kitchen, incorporating a main switch, RCD protection and surge protection.
The unit was positioned inside the kitchen cabinetry.
New electrical circuits
The installation included:
- New kitchen ring final circuit.
- Separate radial socket circuit.
- New lighting circuit.
- Smoke alarm circuit.
- Dedicated cooker supply from the consumer unit through a cooker isolator to the freestanding cooker with integrated hob.
- Electrical provisions for the kitchen extractor, fridge-freezer and dishwasher (dishwasher provision to be confirmed).
Lighting installation
During first fix, we installed wiring for recessed downlights, pendant lights and external lighting.
After the plasterboarding was completed, the customer decided not to proceed with the recessed downlights. The cabling was retained for possible future use.
During second fix, we installed and connected two decorative pendant lights above the central kitchen island.
The external lighting was pre-wired but has not yet been completed.
Sockets and accessories
We installed decorative white metal Knightsbridge double sockets with screwless faceplates.
The kitchen island also received a socket on its side, providing a convenient charging point.
Installation timescale
First fix took two working days with two electricians and the second fix was completed over two separate working days, coordinated around the building and plastering works.
Testing and certification
The completed electrical installation was inspected and tested. An Electrical Installation Certificate (EIC) was issued, and Building Regulations notification was completed through Building Control.
To discuss an extension electrical installation in Winchester, fill in our contact form or give us a call today!